All design systems Lineardesign system · reference
Dark interfaceMeasured linear.app

Linear

Sleek, focused, and almost black, built for people who live in the product all day.

This page is styled with Linear’s own measured values. It is a private reference for AltLeads; their logo, brand and company-only fonts belong to them.

Colours

Each role is a value read from their live website, checked against their screenshots.

Background#08090A
Page behind everything

Surface#101112
Cards, panels, menus

Text#F7F8F8
Headings and body

Muted text#8A8F98
Secondary info

Line#2E2E32
Dividers and outlines

Accent#5E6AD2
Main button, links, selection

On accent#FFFFFF
Text on the accent

Contrast

Text on background 18.7:1Muted on background 6.1:1Text on accent 4.7:1

Every colour found on their site

#D0D6E0#8A8F98#62666D#F7F8F8#FFFFFF#08090A#090A0B#101112#0F1011#5E6AD2#2E2E32#E5E5E6#24282C

Typography

Headings use Inter Variable (free). Body text uses Inter Variable (free).

h1Inter Variable · 64px · 510 · -1.408px
The product development
h2Inter Variable · 48px · 510 · -1.056px
A new species of product tool. Purpose-built for modern team
h3Inter Variable · 20px · 590 · -0.24px
Faster app launch
h4Inter Variable · 16px · 590
Activity
pInter Variable · 15px · 400 · -0.165px
Purpose-built for planning and building products. Designed f
liInter Variable · 16px · 400
Product

Corners & shadows

Corner sizes used

pill
8px
50px
12px
6px
9px

Shadows

Shadow 1
Shadow 2
Shadow 3

Components, rebuilt from their values

Live and clickable. Built by us from the numbers above, not copied from their code. Sample CRM data.

Buttons

Navigation

InterestedCallbackBengaluru
Next call

Licious · Admin head

Wants a proposal before the cafeteria contract renews in March.

Tabs

Table

CompanyOwnerStatusLast touch
Zomato
Food tech · Gurugram
PRCallback18 days ago
Licious
Food tech · Bengaluru
RMInterestedToday
Delhivery
Logistics · Gurugram
ASNo answer35 days ago

Toast

Call logged · callback on Friday

Real components from their site

Cropped from Linear’s live website. Click to enlarge.

Buttons · 2

#5E6AD2 · corners 0px · 32px
#E5E5E6 · corners 9999px · 32px

Navigation bar · 1

no fill · square · Inter Variable 16px

Buttons · 1

fill #E5E5E6 · corners 9999px · Inter Variable 13px

Tags and badges · 4

no fill · corners 4px · Berkeley Mono 12px
no fill · corners 4px · Inter Variable 11px
fill #1C1C1D · corners 999px · Inter Variable 16px
no fill · corners 9999px · Inter Variable 16px

Cards and panels · 3

fill #0F1011 · corners 9px · Inter Variable 16px
fill #161718 · corners 12px · Inter Variable 16px
no fill · corners 8px · Inter Variable 16px

Icons

30 icons copied exactly from their site’s code.

Product screens

10 real screens from web image search, each linked to where it was found.

Do & don’t

What makes it Linear
  • Near-black backgrounds with soft grey text, easy on the eyes
  • One signature indigo-purple accent used sparingly
  • Fully rounded pill buttons and minimal borders
Do
  • Use near-black, not pure black, backgrounds
  • Reserve the indigo accent for key actions and highlights
  • Keep text contrast soft (light grey, not pure white) for body copy
Don’t
  • Don't use pure black or pure white
  • Don't add multiple bright colours
  • Don't clutter with heavy borders or shadows

For AltLeads: Borrow the dark, low-glare theme as an optional focus mode for reps doing long calling sessions.

Copy the tokens

Paste into any project to try this look.

/* Linear · values measured from https://linear.app/ · reference only, their brand belongs to them */
:root {
  --bg: #08090A;
  --surface: #101112;
  --text: #F7F8F8;
  --muted: #8A8F98;
  --line: #2E2E32;
  --accent: #5E6AD2;
  --on-accent: #FFFFFF;
  --radius-button: 8px;
  --radius-card: 9px;
  --radius-small: 6px;
  --button-height: 32px;
  --font-heading: "Inter Variable", "Inter", system-ui, sans-serif;
  --font-body: "Inter Variable", "Inter", system-ui, sans-serif;
  --shadow: rgba(0, 0, 0, 0.2) 0px 0px 0px 1px;
}
Enlarged image
Linear